Annual Progress Report 2072/73 BS (2015 - 16 AD)

Executed project activities

S.N. Name of the project Period of project implementation Funding agency Total project cost Amount spent during the fiscal year 2072/2073
Optimum land use planning for enhancing water availability to sustain livelihood based ecosystem services in Chitwan Annapurna Landscape (CHAL) March 2015 to March 2016 (12 months) WWF/ USAID /Hariyo Ban NPR. 18,78,500 NPR. 9,78,500
Morphometric   analysis of Bagmati River Basin, Nepal, using remote sensing and GIS techniques January 2016 to March 2016 (3 months, UIZ
The Centro-Eastern Elephant Corridor Expedition

 

Major achievements/outputs

  1. Land cover mapping of 4 watersheds (Chhabdi, Guhe, Gharmi and Bhoti Khola) in Tanahun and Kaski districts of Nepal, field survey for verification and sampling, laboratory measurements and assessment of soil properties (soil organic carbon, bulk density, texture) and collection of socio-economic information from secondary sources.
  2. The morphometric characterization and evaluation of the Bagmati River was being performed. The working areas included hydrogeological mapping, drainage analysis, evaluation of drainage density, bifurcation ratio of the catchment etc.  Using Geographical Information System tool, calculation and delineation of the morphometric characteristics of the basin was performed.

 

Completed Projects before the fiscal year

S.N. Name of Project Funding Agency Date/Duration
1 Implementing awareness program on HIV, AIDS, maternal health with the financial assistance of village development committee Umwelt und Informationstechnologie Zentrum-UIZ /VDC Bengadawar August, 2013 to February, 2014 (6 months)
2 Mero-Study Supplementary E-learning Platform for Public Educational Institution: Bridging Missing Links of Educational Improvement in Nepal Deutsch-Indisches- Entwicklungs- Forum e.V./ Self June 2012 to June 2013(12 months)
3 Hydrogeochemical study of Groundwater Aquifer for arsenic remediation in Kapilvastu District, Lumbini Zone, Nepal Self December 2011 to June 2012 (7 months)
4 Hydro-geochemical evaluation of groundwater of Bhaktapur Municipality, Nepal Self February 2011 to April 2012 (15 months)

Name of the supporting /co-operation partners

  1. Bengadawar VDC, Dhanusha, Nepal
  2. WWF-Nepal/US-Aid /Hariyo Ban